[Two cleaning methods for industrial air conditioning system cooling tower (1)]
Release date:[2019/10/28] Is reading[607]次

The function of the cooling tower is to cool. The working principle is: heat exchange of the cooling water carrying heat in the tower and the air, transfer the heat to the air and disperse into the atmosphere, thereby providing cooling to the water-cooled chiller. The purpose of water. With the cooling tower, the heat in the water from the water-cooled chiller can be continuously taken away. If the cooling effect of the cooling tower is not good, the cooling effect of the chiller will definitely be greatly reduced.


There are two main schemes for cleaning the cooling tower. Solution 1: shutdown cleaning, scheme 2: neutral cleaning without shutdown.


Solution 1, shut down the cooling tower:


That is, according to the cleaning process, sterilization and algae cleaning → cleaning detergent cleaning → pre-filming → cleaning after cleaning. This scheme requires cleaning time of about 8 days in the shutdown state, and the descaling rate is over 95%.


Cleaning procedures: water washing → sterilization and algae cleaning → cleaning agent descaling cleaning → washing after washing → pre-film → cleaning after cleaning.


Water Flushing: The purpose of water rinsing is to flush out dust, sand, shed algae, and corrosive materials in the system with large flow of water as much as possible, and check for leaks in the system. The flow rate of the flushing water is preferably greater than 0.15 m/s, and the flushing water in the system is drained after the flushing is passed.


Bactericidal and algae cleaning: The purpose of sterilization and algae cleaning is to kill the microorganisms in the system and to peel off the biological slime attached to the surface of the device. After draining the flushing water, the system is added with a bactericidal algaecide for cleaning, and the cleaning is stopped when the turbidity of the system tends to be balanced.


Cleaning solution descaling cleaning: The purpose of cleaning liquid cleaning is to use the cleaning agent to dissolve the scale and oxide in the system and dissolve it in water. The cleaning agent is added to the central air conditioning system to be circulated and cleaned by a circulating pump, and discharged at the highest point and at the lowest point to avoid air blockage and clogging, which affects the cleaning effect. During cleaning, the concentration of the cleaning solution, the concentration of metal ions (Fe2+, Fe3+, Cu2+), the temperature, the pH value, etc. should be detected periodically, and the cleaning is finished when the metal ion concentration tends to be gentle.


Rinsing after washing: This water washing is to rinse off the cleaning liquid and the impurities that are left in the cleaning. The flushing is to disconnect the leading water to wash away the impurities and residual liquid deposited in the short tube. Flushing is to continuously test the pH value, turbidity, and end the flushing when the pH value and turbidity tend to be gentle.


Pre-film: The purpose of the pre-film is to form a complete anti-corrosion protective film on the metal surface in the activated state after cleaning or the metal surface on which the protective film is damaged.


Cleaning after cooling tower cleaning


(1) Cooler, evaporator cleaning. After the cleaning, the main unit's cooler and evaporator opener should be flushed by the special pipe opener. Since the water circulation system of the cooler is exposed to the atmosphere and the heat exchange temperature is high, the scale of the cooler will be better than that. Other places are serious. If necessary, the external open-end circulation system of the cooler should be cleaned and descaled to ensure that each copper pipe in the cooler is unblocked. Rinse the evaporator with high-pressure water, thoroughly wash away the impurities precipitated in the evaporator, and if necessary, clean the external circulation system of the evaporator.


(2) Cooling tower cleaning. Since the cooling tower is exposed to the atmosphere, a large amount of sediment, algae, etc. will adhere to the surface of the cooling tower packing during operation. If it is not cleaned, it will be flushed into the cooler in the future operation to cause heat exchange copper in the cooler. The blockage of the tube affects the heat exchange effect, so the cooling tower must be thoroughly cleaned.


Jiangsu Jincheng Air Conditioning Engineering Co., Ltd. focuses on:

Industrial air conditioners, chemical fiber industrial air conditioners, chemical fiber industry refrigeration, textile industry air conditioners, clean room refrigeration, ventilation ducts, cooling towers, refrigeration machines and other air conditioning units and accessories.


If you want to know more about the product, please contact: Mr. Song 13705113637 Website: http://www.taocunbao.cn/


Keyword:
ADD:No. 18, Rongguang Road, National High-tech Park, Yancheng City, Jiangsu Province Phone: 0086-13705113637 Tell: 0086-0515-88809180 Fax: 0086-0515-88809181 E-Mail: jsjckt@126.com
Copyright ? 2018 All rights reserved
Copyright Jiangsu Jin Cheng Air Conditioning Engineering Co.,Ltd 技術支持:中國丙綸網
主站蜘蛛池模板: 好男人官网在线观看免费播放| 野花日本高清在线观看| 中文字幕人妻伦伦| 亚洲欧美色一区二区三区| 日韩一区二区在线观看视频| 又色又污又爽又黄的网站| 免费a级毛片无码免费视频app| 国产精品日本一区二区在线播放| 正在播放强揉爆乳女教师| 大地资源网高清在线观看免费| 又粗又硬又大又爽免费视频播放| 免费看韩国黄a片在线观看| 在线观看免费a∨网站| 亚洲国产一成人久久精品| 久久久久99精品成人片试看| 午夜亚洲www湿好爽| 色悠久久久久综合欧美99| 波多野结衣的av一区二区三区| 国产特黄级aaaaa片免| 新版天堂资源中文8在线| 国产清纯美女高潮出白浆+色| 少妇夜夜爽夜夜春夜夜高潮| 黑人巨大精品欧美| 99亚洲精品久久久99| 97精品久久久久中文字幕| 少妇宾馆把腿扒开让我添| 中文字幕aav| 精品乱码卡1卡2卡3免费开放| 中文午夜人妻无码看片| 色噜噜狠狠一区二区三区果冻| 国产日产欧产美| 久久精品国产9久久综合| 美女把尿口扒开让男人玩| 亚洲夜色噜噜av在线观看| 18女下面流水不遮图免费图| 欧美xxxxx高潮喷水| 中文字幕亚洲一区二区三区| 一本大道一卡二大卡三卡免费| 亚洲av日韩av永久无码色欲| 大地影院神马高清| 国产freesexvideos中国麻豆|