[Industrial air conditioning ventilation duct installation process]
Release date:[2024/10/31] Is reading[216]次

Industrial air conditioning ventilation duct installation process

1. When the valve is closed to the pipeline and accessories at the engineering port, 23mm thick steel plate should be used for welding. The weld should be full, even and tight.

2. Ventilation pipes in contaminated areas should be welded. The ventilation pipe and the globe valve shall be connected to the flange with the sealing groove, and the contacts shall be flat. Flange gaskets should be complete rings with no joint rubber seal.

3, the thickness of the steel plate of the main project ventilation duct and accessories should meet the design requirements. When the design does not specifically require it. The thickness of the steel plate should be greater than 0.75mm.

4. The engineering pressure measuring pipe is provided with a downward elbow at one end of the airtight protection door, and the other end is located in the ventilation chamber or control room, and a ball valve is installed. The manometer interface through the gas channel shall be welded.

5. The measuring hole of the ventilation pipe and the clean sampling pipe should be made at the same time as the ventilation pipe. The measuring hole and eluent sampling tube should be blocked.

6. The direction of air flow in the ventilation pipe, the opening and closing direction and opening degree of the valve should be clearly and accurately marked.

Exhaust pipe and accessories installation

Air conditioning duct

1, the smoke pipe should be steel pipe or cast iron pipe. When using welded steel pipes, the wall thickness should be greater than 3mm; Pipe joints should be welded. When the flange is connected, the surface of the flange should be flat, and there should be a sealed groove; Heat-resistant rubber pads should be added between flanges.

2. The cast iron exhaust pipe buried in the concrete should be connected with the flange.

3. The exhaust pipe should be equipped with a thermal expansion compensator along the shaft. The unidirectional telescopic joints should be concentric with the front and rear smoke pipes. The connection between the exhaust pipe and the exhaust pipe of the diesel engine should have a buffer facility.

4. The installation of the exhaust pipe shall meet the following requirements:

(1) The slope of the eldest son should be 0.5, and the water valve should be set at the low point;

(2) The cleaning hole baffle should have a heat-resistant pad and should be firmly fixed;

(3) When the exhaust pipe passes through the partition wall, the gap around it should be filled with asbestos rope;

(4) The connection between the smoke exhaust pipe and the smoke exhaust pipe shall be embedded with a sealed short pipe, which shall pass through the wall, and shall be provided with a flange and a closed wing ring.

(5) The ground outlet of the smoke exhaust pipe should be provided with a rain cap, and measures should be taken to prevent the smoke exhaust pipe from being blocked at 150200mm from the ground.

Equipment installation project acceptance

Ventilation system testing should meet the following requirements:

1. Air tightness test The air tightness test is to seal the pipeline and close the valve, the inflation pressure is 5.06×104Pa, and the sealing is 5 minutes.

2. The air tightness test of the filter absorption tower shows that the pressure drop value within 5 minutes after the pressure is 1.06×104Pa is not more than 660Pa;

3. Overpressure test of filter and ventilation works, the overpressure value should be 3050Pa;

4, cleaning, filter, isolation ventilation modes switch between each other. Various ventilation modes of inlet, send to, line, and. Return air volume and pressure meet the design requirements; 5. The temperature and relative humidity of the main equipment room must meet general requirements.


Industrial air conditioning, chemical fiber industrial air conditioningchemical fiber industry refrigeration ,textile industrial air conditioning dust-free workshop coolingventilation pipeline, cooling tower, freezer and other air conditioning units and accessories.

Jiangsu Jincheng Air Conditioning Engineering Co., Ltd. is a comprehensive manufacturer of special air-conditioning equipment design, production, installation, and commissioning of clean room, electricity, tobacco, civil air defense engineering, medical clean room, clean room, electricity, tobacco, civil air defense engineering, medical clean room. Mainly produce JCZK combined air conditioning unit, cooling tower, glass steel ventilated galvanized sheet pipe, stainless steel pipe, polyurethane ventilation pipe and air conditioning accessories, Jincheng air conditioner is wide, the type, the unique model, superior performance, and user Favused.



Keyword:
ADD:No. 18, Rongguang Road, National High-tech Park, Yancheng City, Jiangsu Province Phone: 0086-13705113637 Tell: 0086-0515-88809180 Fax: 0086-0515-88809181 E-Mail: jsjckt@126.com
Copyright ? 2018 All rights reserved
Copyright Jiangsu Jin Cheng Air Conditioning Engineering Co.,Ltd 技術支持:中國丙綸網
主站蜘蛛池模板: 欧美人妻体内射射| 亚洲国产精品久久久久婷婷老年| 美女视频黄的全免费视频| 7777久久亚洲中文字幕蜜桃| 亚洲中文字幕无码一区在线| 欧洲精品久久久av无码电影| 亚洲中文字幕无码不卡电影| lsnzyzy15狼少资源站| 偷国产乱人伦偷精品视频| 噼里啪啦免费观看视频大全| 国产成人精品免费久久久久| 人人妻人人妻人人片色av| 野花高清手机免费观看hd| 日韩中文字幕推理片| 国产女人高潮抽搐喷水免费视频| 精品国产乱码久久久久久| 丝袜人妻一区二区三区| 亚洲国产精品久久久久秋霞| 欧美成人高清ww| 少妇内射视频播放舔大片| 亚洲精品国产综合久久久久紧| chinese性内射高清国产| 成人片黄网站色大片免费观看app| 娇妻被又大又粗又长又硬好爽| 亚洲av无码专区国产乱码电影| 99久久精品国产一区二区蜜芽| 亚洲 自拍 另类 欧美 综合| 欧美一进一出抽搐大尺度视频| 亚洲av永久无码精品网址| 丰满少妇作爱视频免费观看| 亚洲综合无码精品一区二区三区 | 宅男噜噜噜66在线观看| 精品人人妻人人澡人人爽人人牛牛 | 一面膜胸口一面膜视频| 蜜臀av一区二区| 真人性囗交69视频| 亚洲色大成网站www久久九九| 久久丫精品国产亚洲av| 日本熟妇色视频hamster| 漂亮人妻洗澡被公强 日日躁| 亚洲成无码人在线观看|